2020 Achievements

2-Cairo west thermal super critical projects

  1. Cairo west thermal super critical,E2R won the trust of one of the world's largest companies in power generation projects, at 8/10/2019 till now, E2R signed a P.O. (consultancy and designs works) for Cairo west Power Stations thermal supercritical 1x650 MW Project CP-118 with Chinese International Company Energy China - JEPCC1
    • Scope of work
    • 3D Model, Load calculations GA’s Typical details and detailed drawings.

  2. Amendment No.1 of contract dated 8/10/2019 between JEPCC1 & E2R at 23 / 1 / 2020.

    3. Amendment No.2 of contract dated 8/10/2019 between JEPCC1 & E2R singed March 2, 2020

    • Design access ways for the Foam monitors for Mazout Tanks.
    • Design access platforms for SD-PV- Check Valves.
    • Design the exhaust Duct Supporting in the mezzanine floor.
    • Scope of work
    • 3D Model, Load calculations GA’s Typical details and detailed drawings.


Agreements

E2R Engineering Consultants (Cairo, Egypt) & Enprox Overseas Limited(Halifax, Nova Scotia, Canada) , signing the framework agreements of Project Engineering and Management Consultancy The signing ceremony took place in the presence of Mr. Antar Mustafa Director of E2R , and the President Director of Enprox Overseas Limited Mr Khaled Ibrahim This agreement enter entered on this First day of Jan 2019