2019 Achievements

1- Pico energy projects

E2R Egyptian Engineering consultants created 3D model of Production Oil Facility.

  • E2R received the documents of this facility from PICO Energy side by at 29th, 2018.
  • E2R have studied carefully the received documents from Pico side by email hence prepared this initial conceptual design of early production oil facility.
  • This 3D revision is not official, not accurate, not reviewed and Invalid export of detailed designs.

2- Cairo west thermal super critical projects


  • CP 106 SUBCONTRACTED KAHROMIKA SUB DOOSAN SCOPE MSV Stress Analysis
  • E2R Scope
  • 3D Model Load Calculations General Arrangements Typical details Detailed drawing.


3- Cairo west thermal super critical

  • E2R won the trust of one of the world's largest companies in power generation projects, at 8/10/2019, E2R signed a P.O. (consultancy and designs works) for Cairo west Power Stations thermal supercritical 1x650 MW
  • Project CP-118 with Chinese International Company Energy China - JEPCC1

Agreements

E2R Engineering Consultants (Cairo, Egypt) & Enprox Overseas Limited(Halifax, Nova Scotia, Canada) , signing the framework agreements of Project Engineering and Management Consultancy The signing ceremony took place in the presence of Mr. Antar Mustafa Director of E2R , and the President Director of Enprox Overseas Limited Mr Khaled Ibrahim This agreement enter entered on this First day of Jan 2019